diff options
author | John Crispin <john@openwrt.org> | 2015-03-06 07:57:10 +0000 |
---|---|---|
committer | John Crispin <john@openwrt.org> | 2015-03-06 07:57:10 +0000 |
commit | 8573891dfeb55e96d878382a242ee34a7d51df37 (patch) | |
tree | 154bb94d6676c613d2edd77d8a26660dabfa6dad /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | 57c7bed820edc45d59575c82d1bfd30cacf38395 (diff) | |
download | mtk-20170518-8573891dfeb55e96d878382a242ee34a7d51df37.zip mtk-20170518-8573891dfeb55e96d878382a242ee34a7d51df37.tar.gz mtk-20170518-8573891dfeb55e96d878382a242ee34a7d51df37.tar.bz2 |
openssl: enable ARM assembly acceleration
Tested myself on ixp4xx and mvebu, and (originally)
by Daniel on i.MX6. Also tested on a MIPS target,
to make sure the change to ASFLAGS does not break things.
Based on a patch submitted by Daniel Drown:
https://lists.openwrt.org/pipermail/openwrt-devel/2014-July/026639.html
Signed-off-by: Claudio Leite <leitec@staticky.com>
Signed-off-by: Daniel Drown <dan-openwrt@drown.org>
SVN-Revision: 44618
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions