summaryrefslogtreecommitdiff
path: root/target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch
diff options
context:
space:
mode:
authorJohn Crispin <john@openwrt.org>2015-04-14 19:00:57 +0000
committerJohn Crispin <john@openwrt.org>2015-04-14 19:00:57 +0000
commit911cf6da609fb729070e6785d93e47a147f5e3b0 (patch)
tree203c0ff478d3a94dca83497c91ef4b359a3c0716 /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch
parentefbdc168ff03335f811a5660b832f33d8fda2743 (diff)
downloadmtk-20170518-911cf6da609fb729070e6785d93e47a147f5e3b0.zip
mtk-20170518-911cf6da609fb729070e6785d93e47a147f5e3b0.tar.gz
mtk-20170518-911cf6da609fb729070e6785d93e47a147f5e3b0.tar.bz2
ar71xx: Enable AT803X_PHY to set special flags
Open-Mesh OM5P-AN use a AT8035 (F1E) behind one of the ethernet ports. This PHY requires special flags to work correctly. Otherwise massive packet loss happens with active POE or when switching the link speed from gigabit ethernet to fast ethernet. The generic PHY doesn't have support to change these settings. Signed-off-by: Sven Eckelmann <sven@open-mesh.com> SVN-Revision: 45439
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions