diff options
author | Felix Fietkau <nbd@openwrt.org> | 2015-09-11 16:35:46 +0000 |
---|---|---|
committer | Felix Fietkau <nbd@openwrt.org> | 2015-09-11 16:35:46 +0000 |
commit | 6c1adb3eecff7e86f7396e1aa443ee1ce947d9ec (patch) | |
tree | fa3f49a2bae3aabc69ba845a763d461552d6f4a3 /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | 9da3a6283995f9168de3fc54e4e3859caa840015 (diff) | |
download | mtk-20170518-6c1adb3eecff7e86f7396e1aa443ee1ce947d9ec.zip mtk-20170518-6c1adb3eecff7e86f7396e1aa443ee1ce947d9ec.tar.gz mtk-20170518-6c1adb3eecff7e86f7396e1aa443ee1ce947d9ec.tar.bz2 |
lantiq: Use the BAR0 base address in the ath PCI fixup code
Fixes support for AR9287 on TP-Link TD-W8980 and possibly other devices
which have an ath wifi chip at a PCI address other than 0xb8000000
(TD-W8980 for example has it's wifi chip at 0xbc000000).
Signed-off-by: Geoffrey McRae <geoff@spacevs.com>
Signed-off-by: Martin Blumenstingl <martin.blumenstingl@googlemail.com>
SVN-Revision: 46869
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions