summaryrefslogtreecommitdiff
path: root/target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch
diff options
context:
space:
mode:
authorJohn Crispin <john@openwrt.org>2015-08-17 06:24:34 +0000
committerJohn Crispin <john@openwrt.org>2015-08-17 06:24:34 +0000
commit1a392636a5b5694178d5f802efa9c220ff9dbabf (patch)
treed45219de54facc5de86f9131d5492bd475079418 /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch
parentaf60c367b7a16d80dba422b00fde2611a7c7d2ca (diff)
downloadmtk-20170518-1a392636a5b5694178d5f802efa9c220ff9dbabf.zip
mtk-20170518-1a392636a5b5694178d5f802efa9c220ff9dbabf.tar.gz
mtk-20170518-1a392636a5b5694178d5f802efa9c220ff9dbabf.tar.bz2
ramips: use consistent naming scheme for LEDs
The upstream LED naming convention is "device:color:led-name", but it seems that many of supported boards in OpenWrt don't follow this approach. The following patch fixes this inconsistency in dts{,i} files and updates base-files scripts for ramips target: * fixes wrong indentation * keeps case statements structure in same convention as in other scripts (no empty line after ";;", no indentation for case...esac body) * fixes wrong LED names for some of boards (makes them the same as in dts{,i} files) * combines boards with same configuration (ex. set_wifi_led "rt2800pci-phy0::radio" in 01_leds) Signed-off-by: Piotr Dymacz <pepe2k@gmail.com> SVN-Revision: 46664
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions