diff options
author | John Crispin <john@openwrt.org> | 2015-08-17 06:24:04 +0000 |
---|---|---|
committer | John Crispin <john@openwrt.org> | 2015-08-17 06:24:04 +0000 |
commit | af60c367b7a16d80dba422b00fde2611a7c7d2ca (patch) | |
tree | eca3466e8014f320c43aed0484a5cf2e37c0e1dc /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | a2b38ebf77844460eaf8f4c2496af505e001b49d (diff) | |
download | mtk-20170518-af60c367b7a16d80dba422b00fde2611a7c7d2ca.zip mtk-20170518-af60c367b7a16d80dba422b00fde2611a7c7d2ca.tar.gz mtk-20170518-af60c367b7a16d80dba422b00fde2611a7c7d2ca.tar.bz2 |
ar71xx: add support for TP-Link TL-WDR6500 v2
Signed-off-by: Weijie Gao <hackpascal@gmail.com>
This patch adds support for TP-Link TL-WDR6500 v2.
The firmware has a U-Boot header for kernel, and a TP-LINK v2 header for
the whole firmware, so I have to create a new firmware creation method.
SVN-Revision: 46663
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions