diff options
author | Hans Dedecker <dedeckeh@gmail.com> | 2018-09-13 09:26:44 +0200 |
---|---|---|
committer | Hans Dedecker <dedeckeh@gmail.com> | 2018-09-13 11:06:30 +0200 |
commit | 24d82c2e5c34b69f35645f545fa654456e044947 (patch) | |
tree | 5ab0415bff8eac500a08d81376c04059fa926e7b /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | 918ec4d549cc80b590e50003d0c489c27f864749 (diff) | |
download | mtk-20170518-master.zip mtk-20170518-master.tar.gz mtk-20170518-master.tar.bz2 |
toolchain/glibc: update to latest 2.26 commitmaster
c5c90b480e Fix segfault in maybe_script_execute.
174709d879 pthread_cond_broadcast: Fix waiters-after-spinning case [BZ #23538]
Signed-off-by: Hans Dedecker <dedeckeh@gmail.com>
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions